You are here

Isothermal and intercooled compression
10/24/2013
Every successful installation starts with a good foundation
07/16/2013
More on rotor misalignment
03/22/2013
Testing for unbalance
03/21/2013
Gas turbine selection: heavy frame vs. aero-derivative units
04/24/2012
Technical notes on gas turbine sizing, speed, start-up, and component life
12/11/2011
Tutorial on Modern Gas Turbines: Air-compressor, Combustion, Turbine, Control, Monitoring and Performance Curves
11/08/2011
Experience with intake air cooling at Watson Cogeneration Company
10/17/2011
Optimum Design of Turbo-Compressor: Inter-stage Pressures, Stage Curve and Auxiliaries
10/14/2011
The latest lessons in turbomachinery: Outdoor vs indoor, piping and auxiliary equipment
10/05/2011
The future LNG plant: Electric or aeroderivative
10/05/2011
Practical torsional analysis of complex compressor trains
09/29/2011
Condition monitoring
07/18/2011
The hermetically sealed compressor for offshore and subsea
06/30/2011
Reinjection compressors
06/22/2011
Specifying coupling and gear units for compressors in high-pressure service
06/17/2011
Shop test of centrifugal compressors
06/07/2011
Turbomachinery for offshore LNG
05/31/2011
More efficiency and power through a Brayton cycle backing system
05/27/2011
Practical anti-surge systems for turbocompressors
05/25/2011
Dry gas seals: Problems and solutions
04/27/2011
Are recuperators always great?
01/31/2011