
The Port of Victoria project would be only the second U.S. project to pursue NRC construction licensing for the GE Vernova Hitachi Nuclear Energy boiling water SMR design.
Boosts efficiency and thermal output in SmartCycle and SmartCool series
ETW Energietechnik is improving its biogas upgrading system in the ETW SmartCycle and ETW SmartCool series. The company has integrated a heat pump into the ETW SmartCycle biomethane facility, resulting in reduced electricity consumption and heat waste. The ETW SmartCool liquid CO2 liquefaction plant can also be augmented with a heat pump that can generate a thermal output of up to 220 kWthermal at 65°C or even up to 450 kWthermal when connected with the liquefaction plant.






