OR WAIT null SECS
October 11, 2024
Woodside Louisiana LNG, formerly the Driftwood LNG development opportunity, is an under-construction LNG production and export terminal with 27.6 MTPA permitted capacity.
October 10, 2024
On our Turbo Tour of EthosEnergy, Engineering Manager Philip Booth spoke about the repair, overhaul, and aftermarket markets.
October 09, 2024
Siemens Energy is developing a high-speed rotor hydrogen compressor, Turbo Heater, and rotating olefin cracker.
October 08, 2024
Operated and non-operated interests in the Athabasca Oil Sands Project (AOSP) and Duvernay shale will be sold to Canadian Natural Resources in a $6.5 billion all-cash transaction.
October 07, 2024
The United States and Brazil will collaborate on various clean-energy initiatives: bioenergy-to-hydrogen, clean energy for remote communities, carbon and methane management, and more.
Related assets, manufacturing capability, and personnel have been transferred to Honeywell, including the coil-wound heat exchanger manufacturing facility in Port Manatee, FL.
October 04, 2024
In this episode of the TurboTime podcast, Daniel Tegtmeier, Director of EthosEnergy’s Performance Center, talks about remote operations and monitoring.
October 03, 2024
At full capacity, the new gigahub will enable the automated series production of PEM stacks with a potential total electrolysis capacity of more than 5 GW per year.
The company acquired APSCO, a hydraulic and pneumatic provider; Blutek, a compressed air and nitrogen generation solutions designer; and UT Pumps, a screw and plunger pump manufacturer.
October 02, 2024
The completion follows Woodside’s agreement to acquire OCI Clean Ammonia’s 1.1 MTPA Clean Ammonia Project, which is currently under construction with production planned for 2025.