Revitalizing Energy Infrastructure: Extending the Life of Gas Turbines
October 16th 2025With the energy transition accelerating and much of the existing infrastructure reaching the end of its operational life, modernization has become essential for the gas transmission sector to maintain safety, capacity, and environmental performance. One standout example is the recent Cab Infrastructure Project undertaken by Braden, a global leader in gas turbine auxiliary equipment for Gas Turbine Systems. Tasked with revitalizing a Gas Turbine compressor unit at a critical site in the South of England, Braden delivered a solution that not only extended the unit’s operational life but also prepared it for a cleaner energy future.