
GE Vernova says the LM2500XPRESS aeroderivative package has been validated on blends of up to 50% hydrogen and the LM6000VELOX package has been tested on 100% hydrogen at its new Greenville, S.C., test facility.
The project is expected to run until Autumn 2022.
MAN Energy Solutions has signed a memorandum of understanding with TAQA Power regarding a pilot project for the local production of green hydrogen to fuel domestic tourist busses. TAQA Power is TAQA Arabia’s power subsidiary based in Cairo, Egypt.
The MoU sets the stage for MAN Energy Solutions to provide technical information to TAQA Power on employing electrolysis for a hydrogen-plant solution, due to run until autumn 2022.
The announcement of the MoU comes in the wake of Egypt’s president, Abdel-Fattah El-Sisi, urging the establishment of an integrated strategy for the production of green hydrogen






