The HI field will increase the feedstock at Nigeria LNG through its Train 7 project, expanding the Bonny Island terminal’s production capacity and Shell’s global LNG volumes.
Thin-wall casings and shell bodies play a critical role in turbomachinery, but their susceptibility to imperfections and buckling raises leakage and failure risks.
Although sealless pumps are optimal designs for ammonia applications, operational challenges may include monitoring the nitrogen purge and installing flexible conduits.
The new infrastructure includes a new power line, main 138-Kv breaker, 100-MVA power transformer, and numerous capacitor banks to allow full-speed, full-load testing.
The assembled M501 JAC gas turbine will be delivered to the 475 MW Amiral Cogeneration Plant in Jubail, Saudi Arabia, supplying electricity and steam for a petrochemical complex.