The new power plant will deploy Mitsubishi Power’s M701 JAC gas turbine with 30% hydrogen co-firing potential, helping to meet the Singaporean net-zero emissions target by 2050.
The field’s advanced floating production, storage, and offloading vessel is equipped with high-pressure gas compression, combined-cycle power generation, and more.
The HI field will increase the feedstock at Nigeria LNG through its Train 7 project, expanding the Bonny Island terminal’s production capacity and Shell’s global LNG volumes.
The assembled M501 JAC gas turbine will be delivered to the 475 MW Amiral Cogeneration Plant in Jubail, Saudi Arabia, supplying electricity and steam for a petrochemical complex.
The September/October 2025 issue covers steam turbine optimization, a pump-centric conversation with the Hydraulic Institute, hybrid grid technology for stabilization, and much more.