|Articles|May 1, 2013

Yokogawa to supply training simulators for Saudi combined cycle plant

Japanese engineering firm Yokogawa Electric Corporation has announced that its subsidiary, Yokogawa Middle East, has received an order to supply systems and operator training simulators for the Kingdom of Saudi Arabia’s Shoaiba II combined cycle power plant, which is being built for Saudi Electricity Company (SEC).

The Shoaiba II combined cycle power plant, located south of Jeddah, will have 10 gas turbines and two steam turbines with a combined output of 1200 MW (two blocks of 600 MW each) and is scheduled to start operations in June 2013, according to the Arab News.

The order is for a comprehensive solution comprising a Centum VP control system and a simulator which will be used to train operators under complex simulated plant operating conditions. The Centum VP control system at the plant will be for the integrated control of heat recovery steam generators (HRSG) and gas turbines.


Related to this article

Myth: Condition Monitoring and the Digital Twin Are AI
Condition monitoring and digital twins get called "AI" at nearly every industry panel, but neither one qualifies on its own. Klaus Brun and Rainer Kurz break down what actually counts as AI and where it fits into turbomachinery's diagnostic and design tools.
Image Credit: Adobe Stock
2025 orders hit a four-year high as gas turbine backlogs push data center developers toward a faster fix, but the rebound is landing just as one of the industry's largest OEMs explores selling the business behind it.