
Guangdong Energy Group (GEG) will add up to 1.34 GW of grid electricity and industrial process steam for a chemical complex in Huizhou, north of Hong Kong.

Guangdong Energy Group (GEG) will add up to 1.34 GW of grid electricity and industrial process steam for a chemical complex in Huizhou, north of Hong Kong.

The Miami facility is equipped with one liquefaction train, three LNG storage tanks, and two separate LNG transfer areas to serve truck and rail.

A major portion of the contracts, approximately $21.2 billion, is allocated toward phase-two development at Jafurah and phase-three expansion of the Master Gas System.

The July/August 2024 issue offers comprehensive coverage on industrial and aeroderivative gas turbines, steam, and hydro turbines.

Part of Baker Hughes’ Panametrics product line, the measurement sensor solutions can be deployed across industries including hydrogen, oil and gas, power generation, and more.

Flexibility and turbine advancements were the focal point of Wednesday’s panel.

Port Arthur LNG, a Texas-based natural gas liquefaction and export terminal, will add up to four liquefaction trains in Phase 1 and Phase 2 of the project.

Heirloom is partnering with CapturePoint to permanently store the facilities’ captured CO2 in Class VI underground wells in northwest Louisiana.

The Texas-based hydrogen production facility is expected to produce 1 billion cubic feet of low-carbon hydrogen daily and more than 1 million tons of ammonia per year.

Day two of Turbo Expo 2024 discusses how lower-carbon fuels, gas turbines, fuel-flexible advancements, electrolyzers, and more work together for a sustainable energy future.

ASME's European Turbomachinery Technical Conference & Exposition is expecting 2,500 attendees and more than 100 exhibitors from 22 countries.

Rolls-Royce Power Systems will launch CATL’s TENER products as part of its mtu EnergyPack QG solution for large-scale battery energy storage systems (BESS).

The carbon capture and sequestration (CCS) system is designed to capture, transport, and store CO2 from flue gas produced by natural gas-powered engines.

RMS performed a digital overlay using a real-time scanner to prepare for the virtual assembly process before replacing the blower.

The Dark Horse Treating Facility contains two acid gas injection wells, Independence AGI 1 and 2, which permanently sequester greenhouse gases up to 18,000 feet underground.

The joint venture will combine Aker Carbon Capture’s (ACC) Just Catch and Big Catch modular plant technologies with SLB’s portfolio of solvent solutions.

After a failure or unscheduled shutdown, if the root cause is not found and eliminated, it can happen again.

NextDecade will sell 1.2 million tons per annum (mtpa) of LNG to Aramco from its Rio Grande LNG facility in the Port of Brownsville, TX.

Greater Tortue Ahmeyim (GTA) will produce gas from deep water reservoirs, with Phase 1 projected to produce around 2.3 mtpa of LNG per year for more than 20 years.

Following a few process steps ensures that pumps are properly installed and extends the life of both pumps and components.

Adhering to Flowserve’s Energy Advantage Program recommendations, Heide Refinery is expected to reduce its power consumption by more than an estimated 2,000 MWh per year.

The high voltage direct current (HVDC) electric offshore transmission system will help connect 40 GW of wind energy in the German and Dutch North Sea.

Turbomachinery operators can prevent leakage at pressure stations and pneumatically operated valves along the length of the compressor by using leak- or loss-free technologies, says NETL.

Turbomachinery coatings are designed to be an added layer of protection for base materials, but even coatings wear down.

The multi-year contract includes the deployment of wireline, coiled tubing, cementing, tubular running, and more within Petrobras’ salt fields offshore Brazil.