March 21st 2025
Petrobras will use the SureCONTROL Premium interval control valve to enhance operational reliability in its high-flowrate offshore fields.
March 20th 2025
The first commissioned vessel is powered by four mtu Series 4000 gas engines and two controllable pitch propellers, reaching a max speed of 23 knots.
“Build Baby Build” has brought about the remake of the energy transition to the energy addition.
March 19th 2025
The project is subject to Nuclear Regulatory Commission approvals and is the first American reactor to restart after ceasing operations.
CO2-induced corrosion is common in Brazil’s pre-salt fields, where Petrobras reinjects CO2 from its production operations into wells to decrease flaring and boost oil recovery.
GE 9HA powered by LNG
Germany fast tracks LNG
Dealing with cybersecurity vulnerabilities
Process gas filters
Middle East turboexpander
Design and Engineering Software
B&K Vibro upgrades Setpoint
Metal Additive Manufacturing
Handbook 2022