The field’s advanced floating production, storage, and offloading vessel is equipped with high-pressure gas compression, combined-cycle power generation, and more.
The HI field will increase the feedstock at Nigeria LNG through its Train 7 project, expanding the Bonny Island terminal’s production capacity and Shell’s global LNG volumes.
Although sealless pumps are optimal designs for ammonia applications, operational challenges may include monitoring the nitrogen purge and installing flexible conduits.
The assembled M501 JAC gas turbine will be delivered to the 475 MW Amiral Cogeneration Plant in Jubail, Saudi Arabia, supplying electricity and steam for a petrochemical complex.
The Murlach field contributes a peak net production of approximately 15,000 barrels of oil equivalent per day to the bp-operated Eastern Trough Area Project.