
The Port Kembla power station will produce up to 635MW of electricity.

The introduction to September/October's cover story discussing the state of carbon capture technology.

The partnership aims to commercialize a small-to-mid scale LNG solution.

The project will take place between October 2021 and March 2025.

IHI will oversee O&M for two of Panamint's cogeneration plants.

The project involves pairing 3D-printed heat exchanger technology with sorbent materials to create a system that effectively extracts carbon dioxide from the air.

MingYing Smart Energy debuted its MySE 16.0-242 hybrid drive turbine.

The RMC will provide continuous monitoring across a variety of oil and gas assets.
The Energy Information Administration reports that lowered demand amidst COVID caused a decline in associated gas production.

The gas turbine OEM has been acquired by US private equity company CSL Capital Management.

Mitsubishi Power Americas and the University of Central Florida have formed an industry-education partnership to establish a NOx emission tracker.

The project is expected to run until Autumn 2022.

Selective electroplating as an alternative to replacing or replating parts.

Velo3D printers can create parts for microturbines, turbopumps, and heat exchangers.

PSEG will sell its fossil fuel portfolio to ArcLight Capital Partners.

Bloom Energy will convert its global fleet to low-leak natural gas to curb methane emissions.

Baker Hughes will provide Chevron with a subsea compression manifold structure.

Vortex Manufacturing recently purchased a second additive manufacturing solution from Velo3D.

The plant is expected to provide power to 600,000 Taiwanese homes.

The facility will process up to 400,000 tons of waste annually.

The technology uses AI to support plant operation and maintenance planning.

The companies will merge on October 1st.

Metrix has released a new seismic velocity transmitter.

The company specializes in the design, manufacturing, and servicing of centrifugal pumps.

A pilot project will launched by the end of the year.

The software provides students with 3D renders of compressors and turbines.

The service contract covers Capstone microturbines installed on a Manhattan skyscraper.

The Biden Administration unveiled a several trillion-dollar infrastructure plan that set the goal of net-zero carbon emissions by 2050.

The two products are designed to "clean and control."