June 13th 2025
NextDecade and Bechtel Energy finalized two lump-sum contracts totaling over $9 billion for the construction of Trains 4 and 5 at the Rio Grande LNG facility.
TurboTime Podcast: Additive Manufacturing with the Myth Busters
June 7th 2024What’s the history of additive manufacturing, how is it used to manufacture turbomachines, and does it really have a future in the turbo industry? Find out more from the Myth Busters in this episode of the TurboTime Podcast.