The new power plant will deploy Mitsubishi Power’s M701 JAC gas turbine with 30% hydrogen co-firing potential, helping to meet the Singaporean net-zero emissions target by 2050.
The LM6000 aeroderivative gas turbines, generating up to 112 MW for the Isaac Power Station, will allow QPM to expand the Moranbah gas production and infrastructure assets.
These 800-volt direct-current microturbines will be integrated in AI Power Blocks, which deliver power, liquid cooling, and computation in a rapidly deployable system.
The motor pipeline compressor design eliminates the need for dry gas seals and lubrication systems, leading to higher reliability and minimized lifecycle costs.
This win marks the company’s first overseas export deal for gas turbines, with Doosan Turbomachinery Services performing maintenance at its Houston-based location.